Kennesaw State University Campus Renovations 2021
KSU Sports Track Phase 1
Description: Drainage Repairs to an existing trench drain, repairs to existing concrete retaining wall, regrading, and installation of additional storm sewer infrastructure to control offsite runoff at the existing Sports Park Track at KSU. Estimated Completion Date: 09.06.2021
KSU University Rooms
Description: Upgrade existing aesthetics of KSU CSC University Rooms: installation of new ceiling design upgrade and installation of new lighting design, installation of new theatrical lighting, re-furnishing existing operable partitions, provide sound partitions above operable walls to extend to deck, installation of sound damper in existing mechanical and, coordination of recent AV upgrade. Estimated Completion Date: 08.06.2021
KSU Waterproofing
Description: Install new expansion joints and, apply new sealant and traffic coating on bridge by KSU Carmichael Student Center.Clean, patch and repair existing CMU and Concrete Surfaces to apply new sealant and high performance water repellent coating. Repair EIFS and reseal building to bridge joints. Extend downspouts to holes core in precast deck to drain on grade below. Estimated Completion Date: 08.26.2021
KSU Stillwell
Description: Interior Renovation of the existing Wilson Bldg. Stillwell Theater that consisted of covering existing CMU walls with gypsum board with a textured finish, painting, new rolled carpet, installing new handrails, 3-Form Panels Privacy Screens, built-in new sound booth. Completion Date: 01.14.2021
KSU Bursar
Description: Project encompassed three areas within Kennesaw Hall. Area 1 – Reconfiguration of existing office suite to meet the needs of the new Bursar Teller Office. Area 2 – Addition of a Double service desk and lighting above in the main Rotunda. Area 3 – Subdivision of an existing office suite to provide additional office space for the Bursar. Completion Date: 01.11.2021
KSU Compactor Enclosure
Description: Construction of a new dumpster and compactor enclosure for KSU University Village, provide new reinforced concrete retaining walls, heavy-duty concrete pad for dumpster and trash compactor, extruded aluminum metal canopy, water connection for hose bib and site walkways. Completion Date: 04.20.2021