Georgia Tech Pylon Signage at Northside & 10th

Location: Atlanta, GA Project Timeline: Completed 2024 Albion, in partnership with JE Dunn, completed the Georgia Tech Pylon Signage project at the intersection of Northside Drive and 10th Street on the Georgia Tech campus. Delivered through a Construction Management at Risk approach, the project focused on improving both the safety and visual identity of this…

Read More

Northwest Classical Academy

Location: Kennesaw, GA Project Timeline: January – December 2024 Albion, in partnership with design firm McMillan, Pazdan, Smith Architecture, provided Design-Build services for Northwest Classical Academy, a public charter school serving students across Georgia. The scope of work included the construction of a two-story addition to the Upper School wing, providing new classrooms, science labs,…

Read More

Georgia State University Library North

Location: Atlanta, GA Project Timeline: February – October 2023 Project Awards: AGC 2024 Build Georgia 1st Place Award Albion was selected as Construction Manager to transform a grade-level parking lot beneath Georgia State University’s Library North building into a dynamic, 18,800 square foot student study and collaboration space. Located in the heart of downtown Atlanta,…

Read More

Wiregrass Technical College Campus Renovations

Location: Valdosta, GA Project Timeline: Completed May 2023 Albion served as Construction Manager at Risk for a two-phase renovation project at Wiregrass Technical College, focused on life safety upgrades and academic facility improvements across the campus. Phase 1, completed in 2021, involved installing new fire suppression systems in Buildings 100 and 200. This included wet…

Read More

Kennesaw State University Campus Renovations 2021

KSU Sports Track Phase 1 Description: Drainage Repairs to an existing trench drain, repairs to existing concrete retaining wall, regrading, and installation of additional storm sewer infrastructure to control offsite runoff at the existing Sports Park Track at KSU. Estimated Completion Date: 09.06.2021 KSU University Rooms Description: Upgrade existing aesthetics of KSU CSC University Rooms:…

Read More

Florida International University – Various Projects

A multi-faceted project at Florida International University in Miami, Florida consisting of renovations and construction of a library Starbucks, an on-campus Chick-fil-A, a campus Chilis, a Panera Cafe, updates to the stadium kitchen/bar, campus servery and dining area plus another Chick-fil-A.

Read More

University of North Georgia – Observatory Replacement

The ‘Observatory Replacement’ project at the University of North Georgia includes replacing the current facility with a new 3,200 GSF single-level structure which will accommodate modern observational equipment with sufficient instructional areas to meet the academic, research, and public outreach needs for UNG. Albion and Warren Epstein & Associates, Architects, Inc. are thrilled to be…

Read More

Kennesaw State University Marietta Campus – Parking Lot Expansion

Recent enrollment, growth, and the expansion of programs on Kennesaw State University’s Marietta campus have increased the demand for student, staff, and faculty parking. KSU had an immediate need for additional parking spaces. This project added 300 new surface parking spaces for students, faculty, and staff. The parking lot is situated south of the Student…

Read More

Kennesaw State University Student Center Entries

KSU Entry Ways

We partnered with CDH Partners to freshen up the entryways to the busy KSU Student Center. In addition to demolishing and building new stairs, adding sidewalks and new lighting, we are building a decorative structure with limestone masonry and plaster at the back entrance to the facility and a large radius structural steel architectural feature with…

Read More

University of West Georgia UTeach Labs & Office

University of West Georgia UTeach Lab office

Location: Carrolton, GA UTeach is an innovative teacher preparation program for students majoring in science and mathematics. This project involved an 8,000 square foot renovation for new offices and a science teaching laboratory. The job called for a team with all the right chemistry and we were proud to be selected as the CM at…

Read More